Projects by Service – Water
Astrolabe Park – Stormwater Renewal Project
The project was driven by stormwater infrastructure improvement works by Sydney Water, with a constructed wetland built, treating redirected stormwater.
read moreBradley Heights
AWC were engaged to design the rehabilitation of a riparian corridor and water body. Transforming a farm paddock and dam into part of what is a extensive green corridor running through the developed land south of Penrith.
read moreDrainage and Erosion Plan for Iron Pot Creek
AWC and Bligh Tanner Consulting Engineers collaborated in providing a holistic erosion and bank stability strategy. The North Drainage and Erosion Management Plan for Iron Pot Creek at Pine Mountain was prepared to reduce erosion and improve bank stability throughout the study area. The Plan includes recommendations for cost-effective ‘green’ engineered staged remedial works that fit in with the surrounding environment.
read moreSydney Olympic Park – Leachate Treatment Wetland and Irrigation
AWC, in partnership with EnviroPacific and Henry and Hymas Consulting Engineers, completed the detailed design and construction of a leachate treatment and disposal system at Sydney Olympic Park.
read moreRiverdale Park, Lake Health Assessment and Restoration Plan
AWC were engaged by Logan City Council to redesign Riversdale Park Lake in Meadowbrook into a high profile urban lake. Various lake treatments were developed and prioritised into actions to be implemented over the next 3-5 years with the first stage of works completed in 2016.
read moreCoolum STP Constructed Wetland Trial
The Coolum STP wetland trial is the most comprehensive investigation into the performance of constructed wetlands for pollution control in recent years.
read moreReef Rescue: Treatment of Agricultural Runoff
AWC have been working with the Burnett Mary Regional Group since 2010 to provide remediation measures that combat diffuse pollution wtihin the Great Barrier Reef catchment.
read moreIron Pot Creek Drainage and Erosion Plan
Iron Pot Creek and associated tributaries have areas of extensive erosion, caused by a combination of historical land clearing, urban development and construction of infrastructure. AWC and Bligh Tanner Consulting Engineers collaborated in providing a holistic erosion and bank stability strategy.
read moreCumbalum Urban Release Area
The Cumbalum Urban Release Area (CURA) is a strategic rezoning to help provide for future housing needs within the Ballina Shire. Following preliminary site investigations by a number of consultants, AWC were commissioned to investigate post-development groundwater scenarios with regard to potential impacts on endangered ecological communities, threatened fauna habitat and the adjacent Ballina Nature Reserve in order to determine the efficiency of stormwater and WSUD proposals and review proposed mitgation measures.
read moreOnsite wastewater management at several country public schools and Reviews of Environmental Factors (REFs)
The NSW Department of Public Works engaged AWC to conduct soil and site assessments for the upgrade of onsite wastewater treatment and disposal systems at several Northern NSW public primary schools/education facilities at The Channon, Dorroughby, Upper Bonalbo, Modanville and Wilsons Creek.
read more