AWC prepared the detailed design and construction supervision for WSUD components of the estate. Tasks included MUSIC modeling, system sizing, drawing preparation and reporting.
The works adjoin remnant vegetation and amenity outcomes were a high priority. The design incorporated an existing farm dam and remnant woodland to achieve a site sensitive design.
Objectives
- Stormwater treatment modelling
- Detailed design drawings and documentation
- Construction estimate and works schedule