Kirkham Rise, Water Body and Stormwater Treatment System

Stormwater treatment | Detailed Design

Purpose

AWC prepared the detailed design and construction supervision for WSUD components of the estate. Tasks included MUSIC modeling, system sizing, drawing preparation and reporting.

The works adjoin remnant vegetation and amenity outcomes were a high priority. The design incorporated an existing farm dam and remnant woodland to achieve a site sensitive design.

Objectives

  • Stormwater treatment modelling
  • Detailed design drawings and documentation
  • Construction estimate and works schedule

Partners & Stakeholders

  • Greater West Landscapes
  • Northrop Consulting Engineer

Industry Awards

Excellence in Integrated Stormwater Design, Stormwater NSW Awards 2017

Project Facts

Client: Price Waterhouse Coopers

Challenges: Retaining existing vegetation, whilst altering function of an waterbody.